For information prior to November 16 follow this blog:

http://se2agbuoy.blogspot.com/

Thursday, December 17, 2009

Electrical Aspect Specifications

Electrical Aspect Group Specifications


  • The buoy needs to be fully functioning for hours it is deployed, each time it is tested.
  • The buoy must be self-powered.
  • The electrical equipment must fit inside the structure of the search buoy.
  • The electrical equipment must maintain its integrity in all conditions.
  • The electrical equipment must maintain its integrity throughout the entire employment without requiring maintenance.

Electrical Aspect Powering Specifications

  • The buoy must be able to gather power disconnected from any outside source.
  • The buoy must be capable of storing power to use in rainy/cloudy conditions.
  • The buoy must gather enough power required to run all electrical equipment.
  • The buoy needs to be compatible with the data collection system.

General Specifications

  • Location: Sandy Hook Bay, New Jersey
  • Environment: Scientific bay setting
  • Condition: Fulling functioning
  • Consumer: Team of scientists

No comments:

Post a Comment